About us
 Activity
 Projects
 DHI Software
 

The chosen projects

  • Research of influence of pollution from agriculture sources on surface water quality in Samica Steszewska catchment, Regional Water Management Board in Poznan, 2004-2006  

  • Real-time Flood Decision Support System Integrating Hydrological, Meteorological and Radar Technologies - FLOOD RELIEF, 5th Framework Programme EU, 2002-2005

  • Extension of the MANTRA-EAST project - new pilot study area: Vistula Lagoon, 5th Framework Programme EU, 2002-2004

  • The model of  water distribution in the Gdansk Water Node for flood protection in the Dead Vistula catchment, Regional Water Management Board in Gdansk, 2003-2004  

  • Implementation of water quantity and quality balance modeling in upper Notec river basin project, Regional Water Management Board in Poznan, 2002-2003

  • Integrated wetland management for the Parseta river catchment area. A demonstration project, The Union of Towns and Communes of Parseta Basin, Regional Water Management Board in Szczecin, Marshalship Office in Szczecin, 2000-2003

  • Modelling studies on Odra channel from Chalupki till Kedzierzyn Kozle and impact of Bukow flood plain and dry reservoir Raciborz on flood wave reduction, Regional Water Management Board in Gliwice, 2002  

  • EIA Report on the "BalticPipe" gas pipe construction according to Helsinki Convention demands, Polish Gas Engineering and Oil Mining, 2001

  • Modelling studies on flow capacity of Kalisz town water system and water management of Wielowies Klasztorna reservoir, Regional Water Management Board in Poznan, 2001

  • Jeziorsko reservoir eutrophication state assessment, Hydroprojekt Sp. z o.o., Poznań, 2000 

  • Flood management in upper Vistula and upper and middle Odra rivers, Regional branches of Institute of Meteorology and Water Management, Regional Water Management Boards - Wroclaw and Krakow, 1998-2000

  • Controlling of non-point pollution, Regional Water Management Board in Gdansk, 1998-2000

  • Assessment and minimization of environmental impacts of the Wielowies Klasztorna reservoir, Regional Water Management Board in Poznan, 1997-1998

  • Water quality management strategy for the Vistula river lagoon, Regional Water Management Board in Gdansk, Voivodship Elblag, 1996-1997

  • Swepol link for HVDC - between Sweden and Poland, Consortium: Vattenfal, Svenska Kraftant AB, Sweden and Polish Energy Grid Co. S.A., 1996

  • Rainfall-runof, hydrodynamic and water quality modelling studies of the Prosna river catchment, Regional Water Management Board in Poznan, 1996

  • Operational water quality model of the Parseta river, Regional Water Management Board in Szczecin, 1995-1996

  • Environmental assessment and planning for Polish and Kalliningrad parts of the Vistula river lagoon, Kaliningrad Regional Committee for the Environmental Protection and the Nature Resources, Regional Water Management Board in Gdansk, Voivodship Elblag, 1994-1996

  • Baltic submarine cable system - fibre optic submaine telephone cable system Poland and Bornholm, Telecom Denmark, 1995

  • The pilot modelling studies on the water quality modelling of the Pasleka river and coastal region, Elblag Voivodship, 1995

  • The Leba river restoration project, Regional Water Management Board in Gdansk, 1995

  • Fly ash utilization; assessment of the environmental impact of marine coal fly ash land reclamation at Gdansk, Gdansk Power Plant ECII, 1992-1994

  • The Rega river restoration project, Ministry of Environmental Protection, Natural Resources and Forestry, Regional Water Management Board, Szczecin, 1992-1994

 

  Cooperation with:
 

  NIVA

  DHI Water & Environment
 

 

 Geoscience and   
 Marine Research &  
 Consulting Co., Ltd.

 ul. Koscierska 5, 80-328 
 Gdansk, Poland


 tel. (+48) 58 554 31 36
 fax. (+48) 58 554 31 37
 E-mail:  
 geomor@geomor.pl

(C)WPS Design 2004